MOBILE SUBSTATIONS — PROJECT WORKSHEET Shengyu Hengda (Shanxi) Electrical Equipment Co., Ltd. 盛昱恒达(山西)电气设备有限公司 Contact: shengyuhd@gmail.com Project / company: Country / region: Quantity: Required delivery: System voltage and frequency (kV / V / Hz): Provide the required incoming and outgoing system characteristics. Capacity and circuit requirements (kVA / A): State the required capacity and distribution circuit duties. Intended mobility arrangement: Describe how the equipment is to be supported, transported and repositioned. Transport dimensions and mass limits (mm / kg): Provide the project or route constraints that the proposed package must be reviewed against. Site connections: Describe incoming and outgoing interfaces and existing site-equipment details. Deployment environment and duty: Describe locations, operating conditions and the intended use or relocation pattern. Equipment and service boundary: Identify the requested electrical equipment, transport structure and site-support responsibilities. Documents to prepare: - Electrical duty and single-line diagram: Define the required power-distribution arrangement and equipment functions. - Transport and access brief: Provide route constraints, site access and the intended relocation method. - Site interface drawings: Show the connection points and the boundary with equipment at each intended location. The term mobile does not confirm a trailer, road approval, lifting arrangement or rapid connection capability. The mobility format and applicable project requirements need specific review. Unknown requirements can be marked “To be confirmed”. This is a project worksheet, not a product datasheet or confirmed electrical specification.